Construction Has Begun!
Here is a picture of Nate's Dad hard at work. He is the brains behind the construction operation.
We got all the studs lined up for the first wall and everything began to fall into place.
Once we got the hang of it the wall went up very quickly. One wall down two more to go.
Here is Mike Higgins and Mike Spalatro putting up wall number two.
Finally wall number two was completed.
Here is Nate's Dad yelling at us to stop eating lunch and get back to work. This guy never stops working.
The weekend comes to a close and we have the three walls completed. This was a big accomplishment. This week the two bathrooms will get framed and the plumber and electrician will come in and run all their pipes and wires. Hopefully in two weeks we will be putting up sheet rock.
Thursday, January 8, 2009
We've got the Power
The real fun begins Saturday when the lumber arrives at 8 am. I hope to have some more pictures of the construction.
Sunday, January 4, 2009
Demolition Complete
Day two of demolition began as a nice sunny January day in the gym.
Now that the walls and ceiling were down we had to meticulously go around the ceiling ripping out the old wiring and all the screws that held the drop ceiling in.
Saturday, January 3, 2009
Day One
It was a long day and we finally got the ceiling and the three walls down.
We even had to get a second dumpster because one wasn't enough. Thanks Joe for the quick turnover.